Издание на английском языке
This publication aims to enhance understanding of the principal Electronic Chart Display and Information Systems (ECDIS) safety settings and provides guidance to support their correct application by the ECDIS operator. It explains underkeel clearance (UKC) and how this should be calculated and managed by the ECDIS operator.
The information provided is not a substitute for correct adherence to company safety management system (SMS) requirements or the manufacturer's own operational manuals. It should be used in conjunction with recognised type-approved training and onboard best practices.
ECDIS safety settings must be configured correctly to ensure sufficient UKC, accurate interpretation of electronic navigational charts (ENCs) and proper identification of charted objects as navigational dangers or hazards. Incorrect set-up of ECDIS safety settings has led to numerous shipping incidents over the years.
Contents
Abbreviations
1 ECDIS Safety Settings 1
1.1 Introduction
1.2 ECDIS Standards
1.2.1 IMO Standards
1.2.2 IHO Standards
1.2.3 S-1OO Overview
1.2.4 ECDIS Training
1.2.5 Latest Circulars and Marine General Orders
1.3 ECDIS Alerts
1.4 Chart Accuracy and Data Quality
1.4.1 CATZOC Symbols
1.4.2 CATZOC Passage Planning Examples
1.4.3 Case Study - Ke a Trader
1.4.4 Case Study - Indian Partnership
1.5 ECDIS Display Settings
1.5.1 Display Base
1.5.2 Standard Display
1.5.3 All/Other Information
1.5.4 Custom Display
1.5.5 Further ENC Settings
1.6 Safety Contour
1.6.1 Safety Contour Worked Example
1.7 Safety Depth
1.8 Shallow Contour and Deep Contour
1.8.1 Use of ECDIS in Two Colour/Four Colour Depth Shading Mode
1.9 Isolated Dangers
1.9.1 Isolated Danger Shallower than the Safety Contour
1.9.2 Isolated Danger in Shallow Waters
1.10 Detection Area
1.11 Route Check
1.11.1 Configuration of the Route Check
1.11.2 Conducting the Route Check
1.11.3 Manual (Visual) Check
1.12 Bridge Team Meeting and Masters Approval
1.12.1 Case Study - Kaami
2 LJKC Management
2.1 Introduction
2.1.1 UKC Requirements
2.1.2 Dynamic UKC Requirements
2.2 UKC Considerations
2.3 Squat
2.4 Height of Tide (HoT)
2.4.1 Tidal Calculation Software
2.5 UKC Calculations
2.5.1 Vertical Clearance
2.6 UKC Management Plan
2.6.1 Authorities with Minimum UKC Requirements
2.6.2 S-129 and UKC Management Service Providers
2.7 UKC Parameters on ECDIS
2.7.1 Passage Planning Calculation Example
2.8 UKC Monitoring
2.8.1 Monitoring UKC in Coastal Waters
2.8.2 Case Study - MSC Zoe
3 Safety Contour - Worked Examples
3.1 Worked Examples
3.2 Further Guidance
4 Preparation for Audits and Inspections
4.1 PSC Inspections and Audits